A “Simple” Kitchen Renovation in Manhattan – A Designer’s Diary Day 12

We are a week behind on the construction of our client’s kitchen on the Upper West Side. The floor tile is down (Stone Source Chromtech 1.0), the ceiling is drywalled and we are now ready to grout the tile and finish the drywall.

Getting ready to grout the floor

Getting ready to grout the floor

Cabinets Still  in Crates and Waiting to be Installed!

Cabinets Still in Crates and Waiting to be Installed!

Ceiling Ready for Electrcian to wire the light fixtures

Ceiling Ready for Electrician to wire the light fixtures

Still coming soon….cabinet installation…